
Indianapolis, IN
Distribution Center
Sq Ft
Build Time
Location
What We Build

Concrete panels cast on-site and tilted into position. Faster than masonry, stronger than steel stud — the preferred method for facilities above 80,000 SF.
Standard Spec Sheet — Class A Industrial
clear-span
ft grid
reinforced
standard
superflat avail.
K-25 heads
We publish a milestone schedule before we break ground and hold it publicly. If we miss a month marker, you hear about it from us first — not from watching the site.
97.3%
on-schedule
Avg. Completion
11.2 mo
ground to C.O.
Avg. Project
< 2%
cost variance
Change Orders
Completed Projects

Indianapolis, IN
Distribution Center
Sq Ft
Build Time
Location

Columbus, OH
Manufacturing Facility
Sq Ft
Build Time
Location

Louisville, KY
Climate-Controlled Distribution
Sq Ft
Build Time
Location
From the People Who Hired Us
"We broke ground in April and were loading trailers by mid-March — a full month before our lease commitment required it. That month saved us from paying two rents. Erect knew that, and they planned for it."
Marcus Okonkwo
VP of Operations, Meridian Logistics Group
Indianapolis, IN
312,000 SF Distribution Center
"I've worked with three GCs on expansions over the past eight years. The difference with Erect is that they told me about problems before I had to find them. The schedule slipped three days on a concrete pour, and they had a recovery plan in my inbox before I got off the phone."
Diane Hartmann
CEO, Hartline Precision Components
Columbus, OH
186,000 SF Manufacturing Expansion
"Cold storage construction is a different animal — thermal bridging, vapor barriers, ammonia rough-in. Most GCs learn on your job. Erect had built four cold facilities before ours. I didn't pay for their education."
Ray Thibodeaux
President, Bluegrass Regional Foods
Louisville, KY
244,000 SF Cold Storage Hub